Pad site construction showing a sheep’s foot roller used to compact the soil prior to setting forms.
Shower showing waterproofing behind the tile.
Living room with cedar beams being installed.
Kitchen cabinets during construction. Door fronts are being installed. On paint grade doors we use MDF middle panels for its superior smoothness and stability.
On this build we used Moistop Brick Flashing and Moistop Sealant at the base of all brick veneer walls.
Project Highlights